M6 Motorway (Junctions 5 to 8) (Actively Managed Hard Shoulder and Variable Spe
100,00 kr.
90,00 kr.
Trykkes efter bestilling. Bemærk venligst: Forventet leveringstid er 3-5 uger.
Produktbeskrivelse
Enabling power: Road Traffic Regulation Act 1984, s. 17 (2) (3). Issued: 28.05.2013. Made: 18.05.2013. Laid: 24.05.2013. Coming into force: 15.06.2013. Effect: S.I. 1982/1163 modified. Territorial extent & classification: E. Local
Detaljer
- ISBN13 9780111539606
- Sider 8
- Udgivet 2013
- Forlag TSO
- Format Paperback
- Udgave 1
- Sprog Engelsk